Full Technical Project Management
If fully project managed, the initial project will comprise of the following deliverables but may be changed following further analysis.

 Project Initiation
o Project Initiation Document (PID) and other required project management documents.

 Discovery
o Assemble background documentation (as appropriate and available)
o On-site equipment and audit of all devices. The audit will be completed by Ace IT Relocation engineers using Ace IT Relocation audit processes and documents.

 Design
o Review existing asset and connection information and create new environment build, cabling, patching and rack plans.
o Design new network and storage cabling/racking infrastructure.
o Design new data centre cabling/racking infrastructure.

 Planning
o Migration strategy.
o Technical infrastructure provisioning.
o Risk planning and management.
o Operational processes.
o Test and acceptance management. Infrastructure Migration

 Execution
o Management of the new environment infrastructure build.
o Management of transitional and retained systems integration/change
o Delivery of pre-cabled and prepared environment, ready for migration of equipment.
o Delivery and management of the migration of all hardware over multiple phases (TBD).
o Quality, testing and acceptance management.

 Close
o Preparation and handover of all asset and project information for operational teams.
o Formal close of all project tasks.

For more information or a free, competitive quote simply call us now on 0800 6 88 99 66
 

Our Tweets...

Connect With Us...

What They Say...

Thank you and your team for a professional job. Internally the move has been hailed a success, so good news all round. Thanks again

— ICT Operations Manager - HDC

Thanks to your team, the de-commission and relocation of our hardware from our UK sites was a complete success

— Service Delivery Manager - TUI

A huge thanks to your team, you all did a cracking job. The fact I could send emails straight away, is testament to the quality and thoroughness of your work, and the professional way you conducted the project

— Operations Director - HCI

A big thank you for assisting us with our server relocation project over the weekend. We were very impressed with the flexibility to changes on the day, and have no hesitation using Ace IT Relocation in the future

— IT Director - MJG
Google Analytics Communigator Hubspot Live Chat